Western North Ridge Stormwater Project


October 31, 2025

The Western North Ridge project is part of the ongoing stormwater improvements within the North Ridge Drainage Basin. This area, in and around North Ridge Country Club, has dealt with long-standing drainage issues, and this marks the third major project Carolina Civilworks has completed in the neighborhood.

Our work included significant stormwater upgrades through the main corridor and surrounding residential areas. Along the corridor, we completed stream restoration and channel improvements, including new boulder walls for stabilization and flow control. We also replaced aging infrastructure — removing old storm drain pipes and upsizing the system with new box culverts and large diameter RCP.

While in the area, we also upgraded existing utilities, including new water and sewer lines, as well as rehabilitation of older sewer segments. Restoration efforts included grading, stream planting, landscaping, and full surface restoration with new asphalt, curb, and sidewalk.

These improvements will greatly reduce flooding concerns and improve long-term drainage and infrastructure reliability throughout the neighborhood and the North Ridge Basin.


Watch on Instagram