US17 Regional Pump Station & Force Main
Owner / GC
h2g0 Brunswick Regional Water & Sewer
value
$2,139,620.00
Completed date
July 2018
CCI’s first project with H2GO Brunswick Regional Water & Sewer consisted of the construction of a large, regional pump station and associated force main in Leland, NC. A new gravity sewer system that fed into this station was constructed under separate contract. The 1,260 GPM pump station consisted of duplex 70hp pumps set in a 12’ diameter wet well nearly 35’ deep, valve vault, a 12” electromagnetic flowmeter & MH, sampling MH and complete electrical system including an emergency generator. The roughly 11,000 LF of 12” force main required to tie into the existing WWTP included 289 LF of jack & bores and approx. 3,500 LF of horizontal directional drills.